Agenda for 11/6/7 UCN meeting (by JWM)
1. Availability of a beam dump in ISAC+ target hall that we can use.
2. Space required for kicker+septum to divert beam to that dump.
3. Space, shielding and remote handling for UCN source. Cryogenics
estimates for UCN source. (see ucn_concept.ps)
4. Consistency with E-Linac project presentation and ISAC+
presentations for ACOT. (see jmartin-acot-draft2.pdf
which is the draft version that Jeff showed at the ACOT rehearsal on
Monday afternoon. The presentation itself still needs work, aside
from the issue of consistency.)
For e-linac concept see Shane's pdf Shane's ppt version from Shane with the larger suite of options.
For ISAC+ BL4N concept see The purple line on Rick's png file.
Rick's formulae.