Possible modification to the white paper, based on Ewart's and Rick's suggestions (_for_discussion_): a) Before 2010: Fast kicker in the proton hall and use TISOL dump as a dump and UCN source at the Parity area. A remote mechanism to put spallation target into cask like UCNA is required. The peak current would be limited to 10uA. b) After 2010: Construct the UCN source in the ISAC area as described by Rick. This way, the source could take even more current. (or other options discussed by Chuck)